|
|
Geophysical Instrument Pool Potsdam (GIPP)
Evaluation of instrument supply on loan from the Geophysical Instrument Pool
|
Date: 05.02.2025 21:12 h
|
1. Project
2. Projectmanagement
The following sections are evaluated with 0 (very poor) to 9 (excellent) points.
3. Briefing/Training
4. Preparation/Supply of equipment
5. Support during the project
6. Equipment performance